SD Series Manual Rail Clamp, HG HK Rails 15-35 mm, for industrial use

Full details

Request pricing, MOQ and lead time for this product — we reply within 24 hours.

Supply conditions

MOQ1 Set

Values above are the manufacturer's published figures for this series. Anything not listed — dynamic load rating, straightness, preload class — is confirmed against the drawing at RFQ.

Description

Overview

This rail clamp for linear guides is a production part for machine builders, supplied to the dimensions in the table and used wherever an axis has to move or hold with a predictable result. The description below explains what the part does, what has to be decided before ordering, and where it is normally used. A rail clamp grips the guide rail itself rather than the drive, so it holds a carriage in place without relying on the motor or the screw. Most designs close a wedge or a jaw onto the rail with a spring and release it with air or by hand, which means the clamp holds when the machine loses power, and the holding force acts directly on the rail rather than through the drive train.

Key Features

· Lead Time: 3~5days

· MOQ: 1 Set

· Technical Support: Available

· Package: Carton+Plastic bag + Wooden box or according to customers' demands

· Material: 20Crmo+Nickel plating

· Linear guide series: 15 ; 20 ; 25 ; 30 ; 35;45; 55; 65

· Supplied as a replacement part or as a production item for machine builders

· Material, tolerance and surface treatment confirmed against the drawing

Specifications

The parameter table above lists the values published for this item. Where a value depends on the machine it is going into, the drawing or the RFQ fixes it, and we confirm before production rather than after.

Application

The two numbers that matter are the holding force and the rail size the clamp fits. The holding force has to cover the load the axis would otherwise carry plus a margin for a machine that is pushed or loaded while clamped, and the clamp must be matched to the rail series and width rather than to the block, because it grips the rail.

Fitting is a sequence rather than a single action: prepare the mounting face, place the part without forcing it, bring the fasteners up evenly, and check the result before moving on. Where two parts have to be parallel or in line, indicate one against the other rather than trusting the machined faces alone, because stacked tolerances are what turn a good part into an inaccurate axis.

Where it is used: vertical axes that must not drop, machine tools that hold position during a tool change, gantries parked for loading, safety holding on press and lifting equipment, measurement stages locked while a probe is in contact.

The practical way to compare is to list what the axis needs, then check each candidate against that list: the load with its peaks, the accuracy the finished part must hold, the space available, the environment, and the maintenance the customer will actually do. A part that is right on the first four and wrong on the last will not perform, because a machine that is not maintained loses accuracy whatever it was built from.

Installation & Maintenance

Load rating is a working limit rather than a failure point. A part run at its rated load for a long time will reach the end of its life sooner than one run at half that load, because life falls faster than load rises. In a machine the load also moves: an axis that stops and starts applies a peak at each reversal, and a gantry applies a moment when the load is at the end of its stroke rather than over the bearing.

Environment changes the specification more often than load does. Dust and chips get into working surfaces and act as an abrasive; coolant and wash down remove lubricant and start corrosion; heat moves the geometry and changes the clearance that was set cold. Each of these has an answer, but the answer has to be chosen before the order rather than after the machine is built.

Maintenance is inspection rather than servicing. Check for a change in the sound of the axis, for marks that show load concentrated in one place, and for any movement that was not there when the machine was built. Recording the condition at commissioning gives a baseline to compare against later.

Ordering information that shortens delivery: the size designation from the table, any non standard length or bore, the material or coating if the environment requires it, and the quantity for the first order. Where the part is part of a set, order the set so the fit is matched rather than assembling a mixed batch.

Package & Lead Time

Standard export packing: each part is sleeved and cartoned, screws and rails are protected along their length, and larger assemblies travel crated. Lead time is confirmed with the quotation: standard sizes normally ship within 5 to 15 days of a confirmed drawing, custom parts against the agreed schedule. Minimum order is one piece, and sample orders are accepted before a production run.

Request a Quote

Send the model number or the drawing, with the shaft or rail size and the quantity you need, and we will reply with a quotation. For non-standard lengths, bore pairs, keyways and material changes we work from your drawing; bulk orders are quoted per quantity band and a sample can be supplied for approval.