TEBAK Pneumatic AKS20B MKS2001A Rail Clamp
Clamping Elements

Pneumatic AKS20B MKS2001A Rail Clamp, for industrial use

Full details

Request pricing, MOQ and lead time for this product — we reply within 24 hours.

Supply conditions

Place of originChina

Values above are the manufacturer's published figures for this series. Anything not listed — dynamic load rating, straightness, preload class — is confirmed against the drawing at RFQ.

Description

Overview

A rail clamp for linear guides is chosen for the job it does in the axis rather than on its own: the load it carries, the accuracy it has to hold and the way it is mounted decide whether a given size is right. This page sets out those relationships for this range. A rail clamp grips the guide rail itself rather than the drive, so it holds a carriage in place without relying on the motor or the screw. Most designs close a wedge or a jaw onto the rail with a spring and release it with air or by hand, which means the clamp holds when the machine loses power, and the holding force acts directly on the rail rather than through the drive train.

Key Features

· Weight (kg): 0.45

· Core components: other

· Place of origin: China

· Lead Time: 3~5days

· Industry experience: 20 years

· Customized service: Available

· Supplied as a replacement part or as a production item for machine builders

· Material, tolerance and surface treatment confirmed against the drawing

Specifications

The parameter table above lists the values published for this item. Where a value depends on the machine it is going into, the drawing or the RFQ fixes it, and we confirm before production rather than after.

Application

Model designation: AKS20B, MKS2001A.

The two numbers that matter are the holding force and the rail size the clamp fits. The holding force has to cover the load the axis would otherwise carry plus a margin for a machine that is pushed or loaded while clamped, and the clamp must be matched to the rail series and width rather than to the block, because it grips the rail.

Installation decides more of the finished accuracy than the part tolerance does. Mounting faces should be clean and flat, fasteners should be tightened in a sequence that does not distort the body, and the assembly should be checked with an indicator before the machine is run. A part that is bolted down onto a burr or a painted face will not sit straight however accurate it is.

Where it is used: vertical axes that must not drop, machine tools that hold position during a tool change, gantries parked for loading, safety holding on press and lifting equipment, measurement stages locked while a probe is in contact.

Installation & Maintenance

The practical way to compare is to list what the axis needs, then check each candidate against that list: the load with its peaks, the accuracy the finished part must hold, the space available, the environment, and the maintenance the customer will actually do. A part that is right on the first four and wrong on the last will not perform, because a machine that is not maintained loses accuracy whatever it was built from.

The number in the catalogue is a single value, but the load in a real axis is a combination: a vertical component from gravity, a horizontal one from acceleration, and a moment from the offset between the load and the support. All three reach the part at once, so a size chosen only on the vertical load can be marginal once the carriage accelerates with the load at the outer end of its travel.

Temperature deserves a thought on any axis that runs for hours. A part that is clamped between two rigid structures and then warms up has nowhere to expand, so the geometry changes and the load goes up. Where that is likely, one end of the assembly is normally left free to move, and the part is mounted so that the movement does not affect the alignment of the axis.

Look for the signs that matter on this class of part: a polished band where the load concentrates, a burr at an edge that has been hit, corrosion on a bearing surface, and any lost motion that has appeared since installation. Each of these points to a cause in the machine rather than a fault in the part.

Ordering information that shortens delivery: the size designation from the table, any non standard length or bore, the material or coating if the environment requires it, and the quantity for the first order. Where the part is part of a set, order the set so the fit is matched rather than assembling a mixed batch.

Package & Lead Time

Standard export packing: each part is sleeved and cartoned, screws and rails are protected along their length, and larger assemblies travel crated. Lead time is confirmed with the quotation: standard sizes normally ship within 5 to 15 days of a confirmed drawing, custom parts against the agreed schedule. Minimum order is one piece, and sample orders are accepted before a production run.

Request a Quote

Send the model number or the drawing, with the shaft or rail size and the quantity you need, and we will reply with a quotation. For non-standard lengths, bore pairs, keyways and material changes we work from your drawing; bulk orders are quoted per quantity band and a sample can be supplied for approval.

Detail images

Request a Quote

Interested in this product?

Send your details and we will respond within 24 hours.