Request pricing, MOQ and lead time for this product — we reply within 24 hours.
Dimensional and material data for this item is not published in the supplier record. Send the drawing or the application details and we will confirm dimensions, material and accuracy grade within 24 hours.
A rail clamp for linear guides is chosen for the job it does in the axis rather than on its own: the load it carries, the accuracy it has to hold and the way it is mounted decide whether a given size is right. This page sets out those relationships for this range. A rail clamp grips the guide rail itself rather than the drive, so it holds a carriage in place without relying on the motor or the screw. Most designs close a wedge or a jaw onto the rail with a spring and release it with air or by hand, which means the clamp holds when the machine loses power, and the holding force acts directly on the rail rather than through the drive train.
· Lead Time: 3~5days
· Technical Support: Available
· Package: Carton+Plastic bag + Wooden box or according to customers' demands
· Material: 20Crmo+Nickel plating
· Linear guide series: 15 ; 20 ; 25 ; 30 ; 35;45; 55; 65
· Quality: 100% Testing
· Supplied as a replacement part or as a production item for machine builders
· Material, tolerance and surface treatment confirmed against the drawing
The parameter table above lists the values published for this item. Where a value depends on the machine it is going into, the drawing or the RFQ fixes it, and we confirm before production rather than after.
Model designation: YKS12, MKRS1200A.
The two numbers that matter are the holding force and the rail size the clamp fits. The holding force has to cover the load the axis would otherwise carry plus a margin for a machine that is pushed or loaded while clamped, and the clamp must be matched to the rail series and width rather than to the block, because it grips the rail.
Fitting is a sequence rather than a single action: prepare the mounting face, place the part without forcing it, bring the fasteners up evenly, and check the result before moving on. Where two parts have to be parallel or in line, indicate one against the other rather than trusting the machined faces alone, because stacked tolerances are what turn a good part into an inaccurate axis.
Where it is used: vertical axes that must not drop, machine tools that hold position during a tool change, gantries parked for loading, safety holding on press and lifting equipment, measurement stages locked while a probe is in contact.
Choosing between two sizes usually comes down to what the machine will do with the margin. A larger size carries the load more comfortably and lasts longer, but it takes more space, costs more, and may add mass that the drive then has to accelerate. A smaller size saves space and cost but leaves less room for the peak that appears when an axis reverses with the load at the end of its stroke, so the honest comparison is between total cost of ownership rather than unit price.
Load rating is a working limit rather than a failure point. A part run at its rated load for a long time will reach the end of its life sooner than one run at half that load, because life falls faster than load rises. In a machine the load also moves: an axis that stops and starts applies a peak at each reversal, and a gantry applies a moment when the load is at the end of its stroke rather than over the bearing.
Temperature deserves a thought on any axis that runs for hours. A part that is clamped between two rigid structures and then warms up has nowhere to expand, so the geometry changes and the load goes up. Where that is likely, one end of the assembly is normally left free to move, and the part is mounted so that the movement does not affect the alignment of the axis.
Maintenance is inspection rather than servicing. Check for a change in the sound of the axis, for marks that show load concentrated in one place, and for any movement that was not there when the machine was built. Recording the condition at commissioning gives a baseline to compare against later.
For a quotation, send the size, the quantity, the accuracy or grade required and a drawing or photograph of the mounting interface. Where the part has to match an existing machine, the dimensions of the old part and the distance between its mounting holes are the two measurements that avoid a mismatch.
Standard export packing: each part is sleeved and cartoned, screws and rails are protected along their length, and larger assemblies travel crated. Lead time is confirmed with the quotation: standard sizes normally ship within 5 to 15 days of a confirmed drawing, custom parts against the agreed schedule. Minimum order is one piece, and sample orders are accepted before a production run.
Send the model number or the drawing, with the shaft or rail size and the quantity you need, and we will reply with a quotation. For non-standard lengths, bore pairs, keyways and material changes we work from your drawing; bulk orders are quoted per quantity band and a sample can be supplied for approval.






Send your details and we will respond within 24 hours.