
Request pricing, MOQ and lead time for this product — we reply within 24 hours.
| MOQ | 1 Set |
|---|
Values above are the manufacturer's published figures for this series. Anything not listed — dynamic load rating, straightness, preload class — is confirmed against the drawing at RFQ.
A precision drive part is chosen for the job it does in the axis rather than on its own: the load it carries, the accuracy it has to hold and the way it is mounted decide whether a given size is right. This page sets out those relationships for this range. This group covers the small mechanical parts that sit around a linear axis: gear racks that turn rotation into travel along a toothed bar, timing belts that transmit drive over a distance with a defined pitch, and motor mounts that hold a servo or stepper in line with what it drives. They are simple parts, but each one sets a limit on the axis: tooth quality sets the positioning of a rack axis, belt pitch and tension set the stiffness of a belt axis, and the mount sets the alignment of the motor.
· Warranty: 1.5 year
· Weight (kg): 0.8
· Video outgoing-inspection: Provided
· Machinery test report: Provided
· Core components: Motor
· Material: PU
· Supplied as a replacement part or as a production item for machine builders
· Material, tolerance and surface treatment confirmed against the drawing
The parameter table above lists the values published for this item. Where a value depends on the machine it is going into, the drawing or the RFQ fixes it, and we confirm before production rather than after.
Material: PU.
For a rack, the module and the tooth quality decide accuracy and load; for a belt, the pitch, the width and the reinforcement decide stiffness and speed; for a motor mount, the flange size and the bore register decide alignment. All three have to match the motor and the driven part rather than be chosen on their own.
The three things that shorten the life of a part like this are contamination, misalignment and overload. Keep the working surfaces covered during assembly, align to the datum that the machine was built from, and keep the load inside the rating with a margin for the peaks that occur when an axis starts, stops or jams.
Where it is used: rack and pinion gantries, long travel axes, belt driven conveyors and gantries, servo and stepper motor mounting on machine frames.
Choosing between two sizes usually comes down to what the machine will do with the margin. A larger size carries the load more comfortably and lasts longer, but it takes more space, costs more, and may add mass that the drive then has to accelerate. A smaller size saves space and cost but leaves less room for the peak that appears when an axis reverses with the load at the end of its stroke, so the honest comparison is between total cost of ownership rather than unit price.
Two limits belong together: the static one, which sets how much load the part can take without permanent deformation, and the dynamic one, which sets life under movement. A machine that is loaded while stationary is limited by the first, a machine that runs continuously is limited by the second, and a machine that does both has to satisfy whichever number is smaller in the application.
Environment changes the specification more often than load does. Dust and chips get into working surfaces and act as an abrasive; coolant and wash down remove lubricant and start corrosion; heat moves the geometry and changes the clearance that was set cold. Each of these has an answer, but the answer has to be chosen before the order rather than after the machine is built.
Keep the part clean and dry, check the fasteners after the first hours of running, and re-check them at the interval the machine builder sets. A part that has started to move on its mounting shows as a mark around the bolt holes, and that is the point to correct the joint rather than to tighten it again.
For a quotation, send the size, the quantity, the accuracy or grade required and a drawing or photograph of the mounting interface. Where the part has to match an existing machine, the dimensions of the old part and the distance between its mounting holes are the two measurements that avoid a mismatch.
Standard export packing: each part is sleeved and cartoned, screws and rails are protected along their length, and larger assemblies travel crated. Lead time is confirmed with the quotation: standard sizes normally ship within 5 to 15 days of a confirmed drawing, custom parts against the agreed schedule. Minimum order is one piece, and sample orders are accepted before a production run.
Send the model number or the drawing, with the shaft or rail size and the quantity you need, and we will reply with a quotation. For non-standard lengths, bore pairs, keyways and material changes we work from your drawing; bulk orders are quoted per quantity band and a sample can be supplied for approval.






Send your details and we will respond within 24 hours.