TEBAK T20–T25 Lead Screw, dia 25 mm
Lead Screws

T20–T25 Lead Screw, dia 25 mm, for CNC and 3D printers

Full details

Request pricing, MOQ and lead time for this product — we reply within 24 hours.

Dimensions and configuration

Screw diameter25 mm

Material and surface treatment

Screw materialASTM1045,SUS303,SUS304,SS316,SS316L
Surface coatingZinc-plated,nickel plated,hard chromium plated,fluorine coated,tungsten disulfide,black chorme plated

Accuracy and running characteristics

Clearance7e,higher precision is available upon request

Supply conditions

CustomisationCustomized nuts and end machining are available upon drawing
Warranty1.5 year
Place of originJiangsu, China

Values above are the manufacturer's published figures for this series. Anything not listed — dynamic load rating, straightness, preload class — is confirmed against the drawing at RFQ.

Description

Overview

This is a sliding contact screw drive: the nut runs on the thread with a film of lubricant between them rather than on recirculating balls. A lead screw of this type is the standard choice for slower axes, for holding loads that must not drop when the motor is off, and for machines where the cost of a ball screw cannot be justified. The thread is produced on the shaft and the nut is matched to it, so the pair is normally supplied and replaced together.

Key Features

· Warranty: 1.5 year

· Weight (kg): 0.8

· Video outgoing-inspection: Provided

· Machinery test report: Provided

· Core components: Motor

· Manufacturing process: Rolled Thread

· Supplied as a replacement part or as a production item for machine builders

· Material, tolerance and surface treatment confirmed against the drawing

Specifications

The parameter table above lists the values published for this item. Where a value depends on the machine it is going into, the drawing or the RFQ fixes it, and we confirm before production rather than after.

Application

Shaft material: ASTM1045, SUS303, SUS304, SS316, SS316L. Nut material: POM, Brass, Bronze, PEEK, nylon. Manufacturing process: Rolled Thread.

Thread production is by rolling, which forms the thread by displacing material rather than cutting it. A rolled thread has a continuous grain flow that follows the thread profile, so the surface is harder and the thread is stronger in fatigue than a cut one, and no material is removed from the shaft. Rolling also leaves a smoother flank, which reduces friction in the nut. Where a thread has to be cut, for example on a very coarse lead or a special profile, the shaft is machined instead and the surface finish then depends on the finishing pass.

The nut is the half of the drive that wears, and the material decides how the pair behaves. POM and nylon nuts run quietly and need little lubrication, which suits light loads and clean environments; brass and bronze carry more load and tolerate higher temperatures, at the cost of needing grease; PEEK is chosen for high temperature and for chemical resistance, and it is the most expensive of the group. A polymer nut should not be run dry at high load, because the surface will overheat before it wears visibly.

Grade and clearance work together and should be specified together. The thread class sets how much material is on the flanks, and the nut fit sets how much of that becomes clearance. On a machine that has a closed loop with a linear encoder, the screw only has to transmit force and the class can be relaxed; on an open loop machine the class and the clearance both appear in the finished part, so they are worth paying for.

Clearance: 7e, higher precision is available upon request. Surface treatment: Black chrome plated and so on.

Installation & Maintenance

Efficiency of a sliding screw is well below that of a ball screw, and that is the price of self-locking and simplicity. The lost energy becomes heat at the nut, so the load and the speed together set the temperature of the nut rather than the load alone. A screw that is run at high load and high speed with a polymer nut will reach its limit on temperature first, and the symptom is a squeal or a softening of the nut face before any visible wear.

Fitting begins with the bearings, not the nut. Support the screw in its bearings, check that it turns freely by hand, and indicate the journal and the flange face before anything else is attached. Then bring the nut into line with the screw and bolt it to the moving part with the screws just nipped, run the axis through its full travel to let the nut find its line, and only then tighten. A nut that is bolted hard before the line is checked will pull the screw into a bend that shows as a tight spot at one end of the travel.

Cleaning and re-greasing at a fixed interval is the whole maintenance story on most machines. Wipe the thread with a lint-free cloth, remove the old grease with a solvent that does not attack the nut material, and re-apply the specified grease thinly and evenly. Do not mix grease types, because some thickeners are incompatible and the mixture can harden. On a machine that runs intermittently, run the axis through its full travel after greasing so the film is distributed over the whole working length.

Lead screws also carry the adjusting movements of instruments and test equipment, where the requirement is fine resolution rather than speed. A fine lead with a stepper motor gives small steps and high force, and the nut can be preloaded to remove most of the play. The same combination appears on optical mounts, on sampling stages, and on the manual adjustment of machine tools where a handwheel drives a screw through a graduated dial.

For a replacement on an existing machine, the measurements that matter are the diameter and lead measured over several turns, the overall length, the journal diameters and the distance between the bearing shoulders. A photograph of the old screw next to a rule gives a check on all of them. Where the screw is part of a matched pair, the nut should be replaced with it, because a worn nut on a new screw will run badly and give the new part a bad name.

Package & Lead Time

Standard export packing: each part is sleeved and cartoned, screws and rails are protected along their length, and larger assemblies travel crated. Lead time is confirmed with the quotation: standard sizes normally ship within 5 to 15 days of a confirmed drawing, custom parts against the agreed schedule. Minimum order is one piece, and sample orders are accepted before a production run.

Request a Quote

Send the model number or the drawing, with the shaft or rail size and the quantity you need, and we will reply with a quotation. For non-standard lengths, bore pairs, keyways and material changes we work from your drawing; bulk orders are quoted per quantity band and a sample can be supplied for approval.

Detail images

Questions buyers ask about this item

What screw diameter is this?

25 mm

What screw material is available?

ASTM1045,SUS303,SUS304,SS316,SS316L

Request a Quote

Interested in this product?

Send your details and we will respond within 24 hours.