
Request pricing, MOQ and lead time for this product — we reply within 24 hours.
| Material | Gcr15(HRC60~62),9Cr18(HRC55~58) Axial play 0~0.005mm(Can be zero) |
|---|---|
| Surface treatment | Custom ballnut and shaft end machining |
| Preload | P0,P1,P2,P3,P4 |
|---|---|
| Efficiency | >90% |
| Packing | Carton+Plastic bag + Wooden box or according to customers' demands |
|---|---|
| Warranty | 1.5 year |
| Place of origin | Jiangsu, China |
Values above are the manufacturer's published figures for this series. Anything not listed — dynamic load rating, straightness, preload class — is confirmed against the drawing at RFQ.
A ball screw is chosen for the job it does in the axis rather than on its own: the load it carries, the accuracy it has to hold and the way it is mounted decide whether a given size is right. This page sets out those relationships for this range. A ball screw converts rotation into linear movement through recirculating balls that run between the screw and the nut, so the contact is rolling rather than sliding. That is what gives a ball screw its efficiency and its low friction, and it is also why the drive is not self locking: a vertical ball screw needs a brake or a counterbalance to hold position with the motor off.
· Warranty: 1.5 year
· Weight (kg): 1202
· Video outgoing-inspection: Provided
· Machinery test report: Provided
· Core components: Motor
· Material: Bearing steel
· Supplied as a replacement part or as a production item for machine builders
· Material, tolerance and surface treatment confirmed against the drawing
The parameter table above lists the values published for this item. Where a value depends on the machine it is going into, the drawing or the RFQ fixes it, and we confirm before production rather than after.
Accuracy grade: C1, C3, C5, C7. Preload: P0, P1, P2, P3, P4. Axial play: 0~0.005mm(Can be zero).
Accuracy grade, preload class and axial clearance describe how much lost motion and lead error the screw contributes to the axis; diameter and lead decide thrust, speed and buckling; and the end machining has to match the bearing arrangement the machine uses.
The three things that shorten the life of a part like this are contamination, misalignment and overload. Keep the working surfaces covered during assembly, align to the datum that the machine was built from, and keep the load inside the rating with a margin for the peaks that occur when an axis starts, stops or jams.
Where it is used: CNC machine axes, automation gantries, presses and forming equipment, semiconductor and inspection stages, medical and laboratory equipment, packaging machines.
Efficiency: >90%. Material: Bearing steel. Surface: Black chrome plated and so on.
Comparing quoted parts on price alone hides the differences that show up later: the tolerance on the mounting face, the grade of the working surfaces, the flatness of a rail or the straightness of a shaft. Two parts that look the same in a photograph can differ by a factor in life depending on those details, and the difference appears as a machine that holds accuracy after a year rather than one that has to be re-aligned.
The number in the catalogue is a single value, but the load in a real axis is a combination: a vertical component from gravity, a horizontal one from acceleration, and a moment from the offset between the load and the support. All three reach the part at once, so a size chosen only on the vertical load can be marginal once the carriage accelerates with the load at the outer end of its travel.
Temperature deserves a thought on any axis that runs for hours. A part that is clamped between two rigid structures and then warms up has nowhere to expand, so the geometry changes and the load goes up. Where that is likely, one end of the assembly is normally left free to move, and the part is mounted so that the movement does not affect the alignment of the axis.
Look for the signs that matter on this class of part: a polished band where the load concentrates, a burr at an edge that has been hit, corrosion on a bearing surface, and any lost motion that has appeared since installation. Each of these points to a cause in the machine rather than a fault in the part.
Quote requests are answered against the drawing. Send the size, the load or torque the part will see, the mounting dimensions, and the accuracy the axis has to hold. If the application is unusual, say what the machine does, because the same size can be right for one duty and wrong for another.
Standard export packing: each part is sleeved and cartoned, screws and rails are protected along their length, and larger assemblies travel crated. Lead time is confirmed with the quotation: standard sizes normally ship within 5 to 15 days of a confirmed drawing, custom parts against the agreed schedule. Minimum order is one piece, and sample orders are accepted before a production run.
Send the model number or the drawing, with the shaft or rail size and the quantity you need, and we will reply with a quotation. For non-standard lengths, bore pairs, keyways and material changes we work from your drawing; bulk orders are quoted per quantity band and a sample can be supplied for approval.
What preload options are offered?
P0,P1,P2,P3,P4
What material is it made from?
Gcr15(HRC60~62),9Cr18(HRC55~58) Axial play 0~0.005mm(Can be zero)






Send your details and we will respond within 24 hours.