
Request pricing, MOQ and lead time for this product — we reply within 24 hours.
| Material | Gcr15(HRC60~62),9Cr18(HRC55~58) Axial play 0~0.005mm(Can be zero) |
|---|
| Preload | P0,P1,P2,P3,P4 |
|---|---|
| Efficiency | >90% |
| Packing | Carton+Plastic bag + Wooden box or according to customers' demands |
|---|---|
| Warranty | 1.5 year |
| Place of origin | Jiangsu, China |
| MOQ | 1 Set |
Values above are the manufacturer's published figures for this series. Anything not listed — dynamic load rating, straightness, preload class — is confirmed against the drawing at RFQ.
The ball screw in this listing belongs to the group of parts that make a linear axis repeatable: it carries the load, holds the geometry, and sets the accuracy that the rest of the machine can achieve. A ball screw converts rotation into linear movement through recirculating balls that run between the screw and the nut, so the contact is rolling rather than sliding. That is what gives a ball screw its efficiency and its low friction, and it is also why the drive is not self locking: a vertical ball screw needs a brake or a counterbalance to hold position with the motor off.
· Warranty: 1.5 year
· Weight (kg): 0.8
· Video outgoing-inspection: Provided
· Machinery test report: Provided
· Core components: Motor
· Material: Bearing steel
· Supplied as a replacement part or as a production item for machine builders
· Material, tolerance and surface treatment confirmed against the drawing
The parameter table above lists the values published for this item. Where a value depends on the machine it is going into, the drawing or the RFQ fixes it, and we confirm before production rather than after.
Accuracy grade: C1, C3, C5, C7. Preload: P0, P1, P2, P3, P4. Axial play: 0~0.005mm(Can be zero).
Accuracy grade, preload class and axial clearance describe how much lost motion and lead error the screw contributes to the axis; diameter and lead decide thrust, speed and buckling; and the end machining has to match the bearing arrangement the machine uses.
The three things that shorten the life of a part like this are contamination, misalignment and overload. Keep the working surfaces covered during assembly, align to the datum that the machine was built from, and keep the load inside the rating with a margin for the peaks that occur when an axis starts, stops or jams.
Where it is used: CNC machine axes, automation gantries, presses and forming equipment, semiconductor and inspection stages, medical and laboratory equipment, packaging machines.
Efficiency: >90%. Material: Bearing steel. Surface: Black chrome plated and so on.
The practical way to compare is to list what the axis needs, then check each candidate against that list: the load with its peaks, the accuracy the finished part must hold, the space available, the environment, and the maintenance the customer will actually do. A part that is right on the first four and wrong on the last will not perform, because a machine that is not maintained loses accuracy whatever it was built from.
Load rating is a working limit rather than a failure point. A part run at its rated load for a long time will reach the end of its life sooner than one run at half that load, because life falls faster than load rises. In a machine the load also moves: an axis that stops and starts applies a peak at each reversal, and a gantry applies a moment when the load is at the end of its stroke rather than over the bearing.
Temperature deserves a thought on any axis that runs for hours. A part that is clamped between two rigid structures and then warms up has nowhere to expand, so the geometry changes and the load goes up. Where that is likely, one end of the assembly is normally left free to move, and the part is mounted so that the movement does not affect the alignment of the axis.
Keep the part clean and dry, check the fasteners after the first hours of running, and re-check them at the interval the machine builder sets. A part that has started to move on its mounting shows as a mark around the bolt holes, and that is the point to correct the joint rather than to tighten it again.
Ordering information that shortens delivery: the size designation from the table, any non standard length or bore, the material or coating if the environment requires it, and the quantity for the first order. Where the part is part of a set, order the set so the fit is matched rather than assembling a mixed batch.
Standard export packing: each part is sleeved and cartoned, screws and rails are protected along their length, and larger assemblies travel crated. Lead time is confirmed with the quotation: standard sizes normally ship within 5 to 15 days of a confirmed drawing, custom parts against the agreed schedule. Minimum order is one piece, and sample orders are accepted before a production run.
Send the model number or the drawing, with the shaft or rail size and the quantity you need, and we will reply with a quotation. For non-standard lengths, bore pairs, keyways and material changes we work from your drawing; bulk orders are quoted per quantity band and a sample can be supplied for approval.
What preload options are offered?
P0,P1,P2,P3,P4
What material is it made from?
Gcr15(HRC60~62),9Cr18(HRC55~58) Axial play 0~0.005mm(Can be zero)
What is the minimum order quantity?
1 Set






Send your details and we will respond within 24 hours.