TEBAK Precision Ball Screw, dia 12 mm
Ball Screws

Precision Ball Screw, dia 12 mm, for CNC machines

Full details

Request pricing, MOQ and lead time for this product — we reply within 24 hours.

Dimensions and configuration

Screw diameter12 mm

Material and surface treatment

MaterialGcr15(HRC60~62),9Cr18(HRC55~58) Axial play 0~0.005mm(Can be zero)

Accuracy and running characteristics

PreloadP0,P1,P2,P3,P4
Efficiency>90%

Supply conditions

PackingCarton+Plastic bag + Wooden box or according to customers' demands
Warranty1.5 year
Place of originJiangsu, China

Values above are the manufacturer's published figures for this series. Anything not listed — dynamic load rating, straightness, preload class — is confirmed against the drawing at RFQ.

Description

Overview

A ball screw is chosen for the job it does in the axis rather than on its own: the load it carries, the accuracy it has to hold and the way it is mounted decide whether a given size is right. This page sets out those relationships for this range. A ball screw converts rotation into linear movement through recirculating balls that run between the screw and the nut, so the contact is rolling rather than sliding. That is what gives a ball screw its efficiency and its low friction, and it is also why the drive is not self locking: a vertical ball screw needs a brake or a counterbalance to hold position with the motor off.

Key Features

· Warranty: 1.5 year

· Weight (kg): 0.8

· Video outgoing-inspection: Provided

· Machinery test report: Provided

· Core components: Motor

· Material: Bearing steel

· Supplied as a replacement part or as a production item for machine builders

· Material, tolerance and surface treatment confirmed against the drawing

Specifications

The parameter table above lists the values published for this item. Where a value depends on the machine it is going into, the drawing or the RFQ fixes it, and we confirm before production rather than after.

Application

Accuracy grade: C1, C3, C5, C7. Preload: P0, P1, P2, P3, P4. Axial play: 0~0.005mm(Can be zero).

Accuracy grade, preload class and axial clearance describe how much lost motion and lead error the screw contributes to the axis; diameter and lead decide thrust, speed and buckling; and the end machining has to match the bearing arrangement the machine uses.

Installation decides more of the finished accuracy than the part tolerance does. Mounting faces should be clean and flat, fasteners should be tightened in a sequence that does not distort the body, and the assembly should be checked with an indicator before the machine is run. A part that is bolted down onto a burr or a painted face will not sit straight however accurate it is.

Where it is used: CNC machine axes, automation gantries, presses and forming equipment, semiconductor and inspection stages, medical and laboratory equipment, packaging machines.

Efficiency: >90%. Material: Bearing steel. Surface: Black chrome plated and so on.

Installation & Maintenance

The practical way to compare is to list what the axis needs, then check each candidate against that list: the load with its peaks, the accuracy the finished part must hold, the space available, the environment, and the maintenance the customer will actually do. A part that is right on the first four and wrong on the last will not perform, because a machine that is not maintained loses accuracy whatever it was built from.

Load rating is a working limit rather than a failure point. A part run at its rated load for a long time will reach the end of its life sooner than one run at half that load, because life falls faster than load rises. In a machine the load also moves: an axis that stops and starts applies a peak at each reversal, and a gantry applies a moment when the load is at the end of its stroke rather than over the bearing.

Temperature deserves a thought on any axis that runs for hours. A part that is clamped between two rigid structures and then warms up has nowhere to expand, so the geometry changes and the load goes up. Where that is likely, one end of the assembly is normally left free to move, and the part is mounted so that the movement does not affect the alignment of the axis.

Maintenance is inspection rather than servicing. Check for a change in the sound of the axis, for marks that show load concentrated in one place, and for any movement that was not there when the machine was built. Recording the condition at commissioning gives a baseline to compare against later.

Ordering information that shortens delivery: the size designation from the table, any non standard length or bore, the material or coating if the environment requires it, and the quantity for the first order. Where the part is part of a set, order the set so the fit is matched rather than assembling a mixed batch.

Package & Lead Time

Standard export packing: each part is sleeved and cartoned, screws and rails are protected along their length, and larger assemblies travel crated. Lead time is confirmed with the quotation: standard sizes normally ship within 5 to 15 days of a confirmed drawing, custom parts against the agreed schedule. Minimum order is one piece, and sample orders are accepted before a production run.

Request a Quote

Send the model number or the drawing, with the shaft or rail size and the quantity you need, and we will reply with a quotation. For non-standard lengths, bore pairs, keyways and material changes we work from your drawing; bulk orders are quoted per quantity band and a sample can be supplied for approval.

Detail images

Questions buyers ask about this item

What screw diameter is this?

12 mm

What preload options are offered?

P0,P1,P2,P3,P4

What material is it made from?

Gcr15(HRC60~62),9Cr18(HRC55~58) Axial play 0~0.005mm(Can be zero)

Request a Quote

Interested in this product?

Send your details and we will respond within 24 hours.