TEBAK Lead Screw, T16x2 T16x3 T16x4 T16x5 T16x8 T16x9 16
Lead Screws

Lead Screw, T16x2 T16x3 T16x4 T16x5 T16x8 T16x9 16, for CNC and 3D printers

Full details

Request pricing, MOQ and lead time for this product — we reply within 24 hours.

Dimensions and configuration

Screw diameter16 mm
Lead2 mm

Material and surface treatment

Surface coatingZinc-plated,nickel plated,hard chromium plated,fluorine coated,tungsten disulfide,black chorme plated
Surface treatmentCustom lead nut and shaft end machining Various

Accuracy and running characteristics

Clearance7e,higher precision is available upon request

Supply conditions

CustomisationCustomized nuts and end machining are available upon drawing
Warranty1.5 year
Place of originJiangsu, China

Values above are the manufacturer's published figures for this series. Anything not listed — dynamic load rating, straightness, preload class — is confirmed against the drawing at RFQ.

Description

Overview

The working principle of a lead screw is a screw thread used as an inclined plane: the nut converts torque into thrust, and the mechanical advantage comes from the lead being much smaller than the circumference of the shaft. That is why a lead screw can hold a vertical load without a brake and why it is chosen on machines where a simple, self-locking axis is wanted. The trade is friction and efficiency, and the nut material is what decides how much of each.

Key Features

· Warranty: 1.5 year

· Weight (kg): 0.8

· Video outgoing-inspection: Provided

· Machinery test report: Provided

· Core components: Motor

· Manufacturing process: Rolled Thread

· Supplied as a replacement part or as a production item for machine builders

· Material, tolerance and surface treatment confirmed against the drawing

Specifications

The parameter table above lists the values published for this item. Where a value depends on the machine it is going into, the drawing or the RFQ fixes it, and we confirm before production rather than after.

Application

Shaft material: ASTM1045, SUS303, SUS304, SS316, SS316L. Nut material: POM, Brass, Bronze, PEEK, nylon. Manufacturing process: Rolled Thread.

Thread production is by rolling, which forms the thread by displacing material rather than cutting it. A rolled thread has a continuous grain flow that follows the thread profile, so the surface is harder and the thread is stronger in fatigue than a cut one, and no material is removed from the shaft. Rolling also leaves a smoother flank, which reduces friction in the nut. Where a thread has to be cut, for example on a very coarse lead or a special profile, the shaft is machined instead and the surface finish then depends on the finishing pass.

Backlash between the nut and the thread is the quantity that decides how the axis behaves on a reversal. A small clearance keeps the drive free but shows as lost motion when the direction changes; an anti-backlash nut removes that clearance with a spring or a split nut, at the cost of more friction and faster wear. On a vertical axis a small amount of clearance is acceptable because gravity keeps the nut loaded on the same flank, while on a horizontal axis that reverses under load the clearance appears directly as position error.

The accuracy of a lead screw is described by a class that combines the permitted error over a measured length with the permitted variation in the thread. A class such as 7e is the standard commercial grade used on general machinery, and higher classes are available on request. What matters in practice is the lead error over the travel the machine actually uses: a screw that is accurate over 300 mm may still show a larger cumulative error over a metre, and a machine that corrects position with a linear scale does not depend on the screw for accuracy at all.

Clearance: 7e, higher precision is available upon request. Surface treatment: Black chrome plated and so on.

Installation & Maintenance

Life is governed by the nut, not the shaft. A bronze nut in a lubricated industrial axis runs for a long time; a polymer nut in a dry, dusty machine wears faster and produces a fine powder that then acts as an abrasive. Where the nut is the wear part, design access to it: a nut that can be replaced without dismantling the machine turns a long job into a short one, and that is often worth more than a small gain in nominal life.

The coupling between motor and screw has to pass torque without loading the screw bearing, so a flexible coupling is used and the two shafts are indicated before it is tightened. The axial position of the screw should be set at the same time: a screw that is pushed or pulled by its coupling runs with a preload error or with end float, and both show up as position error that no amount of tuning will remove. After the first hours of running, re-check the bearing preload and the coupling screws.

Lubrication is the difference between a lead screw that lasts years and one that wears out in months. A bronze nut wants a film of grease on the thread, renewed at the interval the duty demands; a polymer nut wants little or nothing, but it does want the thread clean. Dust is the enemy of both: a dry dusty thread acts like a lap and wears the nut from the inside. Bellows, a wiper or a simple cover over the exposed thread is cheap insurance on any machine that makes chips or dust.

Lead screws also carry the adjusting movements of instruments and test equipment, where the requirement is fine resolution rather than speed. A fine lead with a stepper motor gives small steps and high force, and the nut can be preloaded to remove most of the play. The same combination appears on optical mounts, on sampling stages, and on the manual adjustment of machine tools where a handwheel drives a screw through a graduated dial.

To quote a lead screw, the useful information is the nominal diameter, the lead, the overall length and the thread length, the material of the shaft and of the nut, the accuracy class and the clearance, and a drawing of the end machining. Where the end detail is not fixed yet, say which bearing and which coupling will be used and the journals can be proposed. Quantity and the delivery date complete the picture.

Package & Lead Time

Standard export packing: each part is sleeved and cartoned, screws and rails are protected along their length, and larger assemblies travel crated. Lead time is confirmed with the quotation: standard sizes normally ship within 5 to 15 days of a confirmed drawing, custom parts against the agreed schedule. Minimum order is one piece, and sample orders are accepted before a production run.

Request a Quote

Send the model number or the drawing, with the shaft or rail size and the quantity you need, and we will reply with a quotation. For non-standard lengths, bore pairs, keyways and material changes we work from your drawing; bulk orders are quoted per quantity band and a sample can be supplied for approval.

Detail images

Request a Quote

Interested in this product?

Send your details and we will respond within 24 hours.