
Request pricing, MOQ and lead time for this product — we reply within 24 hours.
| Place of origin | China |
|---|---|
| Warranty | 3 Months |
| MOQ | 1 Set |
Values above are the manufacturer's published figures for this series. Anything not listed — dynamic load rating, straightness, preload class — is confirmed against the drawing at RFQ.
A lead screw turns rotation into straight-line movement through a threaded shaft and a nut that travels along it. The thread form, the diameter and the lead set the character of the drive: a fine lead gives more force for a given motor torque and finer positioning steps, while a coarse lead gives speed. The screw in this listing is supplied as a shaft with the thread rolled or cut over the working length, with the ends machined to suit the bearing supports and the drive coupling of the machine it goes into.
· Material: ASTM1045SUS303SUS304,SS316,SS316L
· Lead Time: 5~15days
· MOQ: 1 Set
· Clearance: 7e,higher precision is available upon request
· Lead nut material: POM,Brass,Bronze,PEEK, nylon
· Lead screw shaft material: ASTM1045SUS303SUS304,SS316,SS316L
· Supplied as a replacement part or as a production item for machine builders
· Material, tolerance and surface treatment confirmed against the drawing
The parameter table above lists the values published for this item. Where a value depends on the machine it is going into, the drawing or the RFQ fixes it, and we confirm before production rather than after.
Shaft material: ASTM1045, SUS303, SUS304, SS316, SS316L. Nut material: POM, Brass, Bronze, PEEK, nylon. Clearance: 7e, higher precision is available upon request.
Thread production is by rolling, which forms the thread by displacing material rather than cutting it. A rolled thread has a continuous grain flow that follows the thread profile, so the surface is harder and the thread is stronger in fatigue than a cut one, and no material is removed from the shaft. Rolling also leaves a smoother flank, which reduces friction in the nut. Where a thread has to be cut, for example on a very coarse lead or a special profile, the shaft is machined instead and the surface finish then depends on the finishing pass.
Backlash between the nut and the thread is the quantity that decides how the axis behaves on a reversal. A small clearance keeps the drive free but shows as lost motion when the direction changes; an anti-backlash nut removes that clearance with a spring or a split nut, at the cost of more friction and faster wear. On a vertical axis a small amount of clearance is acceptable because gravity keeps the nut loaded on the same flank, while on a horizontal axis that reverses under load the clearance appears directly as position error.
The accuracy of a lead screw is described by a class that combines the permitted error over a measured length with the permitted variation in the thread. A class such as 7e is the standard commercial grade used on general machinery, and higher classes are available on request. What matters in practice is the lead error over the travel the machine actually uses: a screw that is accurate over 300 mm may still show a larger cumulative error over a metre, and a machine that corrects position with a linear scale does not depend on the screw for accuracy at all.
Surface treatment: Black chrome plated and so on.
Life is governed by the nut, not the shaft. A bronze nut in a lubricated industrial axis runs for a long time; a polymer nut in a dry, dusty machine wears faster and produces a fine powder that then acts as an abrasive. Where the nut is the wear part, design access to it: a nut that can be replaced without dismantling the machine turns a long job into a short one, and that is often worth more than a small gain in nominal life.
The coupling between motor and screw has to pass torque without loading the screw bearing, so a flexible coupling is used and the two shafts are indicated before it is tightened. The axial position of the screw should be set at the same time: a screw that is pushed or pulled by its coupling runs with a preload error or with end float, and both show up as position error that no amount of tuning will remove. After the first hours of running, re-check the bearing preload and the coupling screws.
Cleaning and re-greasing at a fixed interval is the whole maintenance story on most machines. Wipe the thread with a lint-free cloth, remove the old grease with a solvent that does not attack the nut material, and re-apply the specified grease thinly and evenly. Do not mix grease types, because some thickeners are incompatible and the mixture can harden. On a machine that runs intermittently, run the axis through its full travel after greasing so the film is distributed over the whole working length.
Typical applications are the axes of machines that move slowly and hold position: 3D printers and laser engravers, desktop CNC routers, laboratory and medical positioning stages, camera and sensor sliders, valve actuators, packaging and labelling machines, and the adjusting axes on woodworking and metalworking equipment. In each case the lead screw is chosen because it holds without a brake, runs quietly, and costs less than a ball screw of the same size.
Ordering detail that prevents a wrong part: the hand of the thread, because a left hand screw is not obvious from a photograph; the position of the thread on the shaft, since a screw threaded over its whole length is not the same part as one threaded between two journals; and whether the nut is flanged or cylindrical. A sketch with the dimensions marked is worth more than a paragraph of description, and it removes the ambiguity that causes most returns.
Standard export packing: each part is sleeved and cartoned, screws and rails are protected along their length, and larger assemblies travel crated. Lead time is confirmed with the quotation: standard sizes normally ship within 5 to 15 days of a confirmed drawing, custom parts against the agreed schedule. Minimum order is one piece, and sample orders are accepted before a production run.
Send the model number or the drawing, with the shaft or rail size and the quantity you need, and we will reply with a quotation. For non-standard lengths, bore pairs, keyways and material changes we work from your drawing; bulk orders are quoted per quantity band and a sample can be supplied for approval.






Send your details and we will respond within 24 hours.