TEBAK High Precision Custom Stainless Steel
Lead Screws

High Precision Custom Stainless Steel, for CNC and 3D printers

Full details

Request pricing, MOQ and lead time for this product — we reply within 24 hours.

Supply conditions

Place of originChina
Warranty3 Months
MOQ1 Set

Values above are the manufacturer's published figures for this series. Anything not listed — dynamic load rating, straightness, preload class — is confirmed against the drawing at RFQ.

Description

Overview

The working principle of a lead screw is a screw thread used as an inclined plane: the nut converts torque into thrust, and the mechanical advantage comes from the lead being much smaller than the circumference of the shaft. That is why a lead screw can hold a vertical load without a brake and why it is chosen on machines where a simple, self-locking axis is wanted. The trade is friction and efficiency, and the nut material is what decides how much of each.

Key Features

· Material: ASTM1045SUS303SUS304,SS316,SS316L

· Lead Time: 5~15days

· MOQ: 1 Set

· Clearance: 7e,higher precision is available upon request

· Lead nut material: POM,Brass,Bronze,PEEK, nylon

· Lead screw shaft material: ASTM1045SUS303SUS304,SS316,SS316L

· Supplied as a replacement part or as a production item for machine builders

· Material, tolerance and surface treatment confirmed against the drawing

Specifications

The parameter table above lists the values published for this item. Where a value depends on the machine it is going into, the drawing or the RFQ fixes it, and we confirm before production rather than after.

Application

Shaft material: ASTM1045, SUS303, SUS304, SS316, SS316L. Nut material: POM, Brass, Bronze, PEEK, nylon. Clearance: 7e, higher precision is available upon request.

Thread production is by rolling, which forms the thread by displacing material rather than cutting it. A rolled thread has a continuous grain flow that follows the thread profile, so the surface is harder and the thread is stronger in fatigue than a cut one, and no material is removed from the shaft. Rolling also leaves a smoother flank, which reduces friction in the nut. Where a thread has to be cut, for example on a very coarse lead or a special profile, the shaft is machined instead and the surface finish then depends on the finishing pass.

The nut is the half of the drive that wears, and the material decides how the pair behaves. POM and nylon nuts run quietly and need little lubrication, which suits light loads and clean environments; brass and bronze carry more load and tolerate higher temperatures, at the cost of needing grease; PEEK is chosen for high temperature and for chemical resistance, and it is the most expensive of the group. A polymer nut should not be run dry at high load, because the surface will overheat before it wears visibly.

Grade and clearance work together and should be specified together. The thread class sets how much material is on the flanks, and the nut fit sets how much of that becomes clearance. On a machine that has a closed loop with a linear encoder, the screw only has to transmit force and the class can be relaxed; on an open loop machine the class and the clearance both appear in the finished part, so they are worth paying for.

Surface treatment: Black chrome plated and so on.

Installation & Maintenance

Efficiency of a sliding screw is well below that of a ball screw, and that is the price of self-locking and simplicity. The lost energy becomes heat at the nut, so the load and the speed together set the temperature of the nut rather than the load alone. A screw that is run at high load and high speed with a polymer nut will reach its limit on temperature first, and the symptom is a squeal or a softening of the nut face before any visible wear.

The coupling between motor and screw has to pass torque without loading the screw bearing, so a flexible coupling is used and the two shafts are indicated before it is tightened. The axial position of the screw should be set at the same time: a screw that is pushed or pulled by its coupling runs with a preload error or with end float, and both show up as position error that no amount of tuning will remove. After the first hours of running, re-check the bearing preload and the coupling screws.

Lubrication is the difference between a lead screw that lasts years and one that wears out in months. A bronze nut wants a film of grease on the thread, renewed at the interval the duty demands; a polymer nut wants little or nothing, but it does want the thread clean. Dust is the enemy of both: a dry dusty thread acts like a lap and wears the nut from the inside. Bellows, a wiper or a simple cover over the exposed thread is cheap insurance on any machine that makes chips or dust.

Where the axis has to hold a load with the motor off, a lead screw is often the simplest answer: the thread angle of a fine lead makes the drive self-locking, so a vertical axis stays where it is put. That is why lead screws appear on lift and adjustment mechanisms, on the Z axis of small machines, on hospital beds and furniture actuators, and on any mechanism where a person sets a position by hand and expects it to stay.

Ordering detail that prevents a wrong part: the hand of the thread, because a left hand screw is not obvious from a photograph; the position of the thread on the shaft, since a screw threaded over its whole length is not the same part as one threaded between two journals; and whether the nut is flanged or cylindrical. A sketch with the dimensions marked is worth more than a paragraph of description, and it removes the ambiguity that causes most returns.

Package & Lead Time

Standard export packing: each part is sleeved and cartoned, screws and rails are protected along their length, and larger assemblies travel crated. Lead time is confirmed with the quotation: standard sizes normally ship within 5 to 15 days of a confirmed drawing, custom parts against the agreed schedule. Minimum order is one piece, and sample orders are accepted before a production run.

Request a Quote

Send the model number or the drawing, with the shaft or rail size and the quantity you need, and we will reply with a quotation. For non-standard lengths, bore pairs, keyways and material changes we work from your drawing; bulk orders are quoted per quantity band and a sample can be supplied for approval.

Detail images

Request a Quote

Interested in this product?

Send your details and we will respond within 24 hours.