
Request pricing, MOQ and lead time for this product — we reply within 24 hours.
| Length | according to your requirement. 7 Manufacturer for ball screw |
|---|
| Material | 45# |
|---|
| Packing | & |
|---|
Values above are the manufacturer's published figures for this series. Anything not listed — dynamic load rating, straightness, preload class — is confirmed against the drawing at RFQ.
This is a sliding contact screw drive: the nut runs on the thread with a film of lubricant between them rather than on recirculating balls. A lead screw of this type is the standard choice for slower axes, for holding loads that must not drop when the motor is off, and for machines where the cost of a ball screw cannot be justified. The thread is produced on the shaft and the nut is matched to it, so the pair is normally supplied and replaced together.
· Lead Screw Type: Tr22*5
· Length: 1000mm
· End Process: Standard
· Material: 45#
· Application: CNC machinery,high-precision applications,servo motor,etc
· Supplied as a replacement part or as a production item for machine builders
· Material, tolerance and surface treatment confirmed against the drawing
The parameter table above lists the values published for this item. Where a value depends on the machine it is going into, the drawing or the RFQ fixes it, and we confirm before production rather than after.
Thread production is by rolling, which forms the thread by displacing material rather than cutting it. A rolled thread has a continuous grain flow that follows the thread profile, so the surface is harder and the thread is stronger in fatigue than a cut one, and no material is removed from the shaft. Rolling also leaves a smoother flank, which reduces friction in the nut. Where a thread has to be cut, for example on a very coarse lead or a special profile, the shaft is machined instead and the surface finish then depends on the finishing pass.
The nut is the half of the drive that wears, and the material decides how the pair behaves. POM and nylon nuts run quietly and need little lubrication, which suits light loads and clean environments; brass and bronze carry more load and tolerate higher temperatures, at the cost of needing grease; PEEK is chosen for high temperature and for chemical resistance, and it is the most expensive of the group. A polymer nut should not be run dry at high load, because the surface will overheat before it wears visibly.
The accuracy of a lead screw is described by a class that combines the permitted error over a measured length with the permitted variation in the thread. A class such as 7e is the standard commercial grade used on general machinery, and higher classes are available on request. What matters in practice is the lead error over the travel the machine actually uses: a screw that is accurate over 300 mm may still show a larger cumulative error over a metre, and a machine that corrects position with a linear scale does not depend on the screw for accuracy at all.
Efficiency of a sliding screw is well below that of a ball screw, and that is the price of self-locking and simplicity. The lost energy becomes heat at the nut, so the load and the speed together set the temperature of the nut rather than the load alone. A screw that is run at high load and high speed with a polymer nut will reach its limit on temperature first, and the symptom is a squeal or a softening of the nut face before any visible wear.
Fitting begins with the bearings, not the nut. Support the screw in its bearings, check that it turns freely by hand, and indicate the journal and the flange face before anything else is attached. Then bring the nut into line with the screw and bolt it to the moving part with the screws just nipped, run the axis through its full travel to let the nut find its line, and only then tighten. A nut that is bolted hard before the line is checked will pull the screw into a bend that shows as a tight spot at one end of the travel.
Maintenance of a lead screw axis is mostly inspection. Look at the thread for a polished band where the nut spends most of its time, which shows the working zone; check the nut for axial play by rocking the driven part with the motor locked; and listen for a change in pitch as the nut passes a particular point, which points to a damaged section of thread. A nut with measurable play can often be adjusted or replaced on its own, without touching the screw.
Where the axis has to hold a load with the motor off, a lead screw is often the simplest answer: the thread angle of a fine lead makes the drive self-locking, so a vertical axis stays where it is put. That is why lead screws appear on lift and adjustment mechanisms, on the Z axis of small machines, on hospital beds and furniture actuators, and on any mechanism where a person sets a position by hand and expects it to stay.
Ordering detail that prevents a wrong part: the hand of the thread, because a left hand screw is not obvious from a photograph; the position of the thread on the shaft, since a screw threaded over its whole length is not the same part as one threaded between two journals; and whether the nut is flanged or cylindrical. A sketch with the dimensions marked is worth more than a paragraph of description, and it removes the ambiguity that causes most returns.
Standard export packing: each part is sleeved and cartoned, screws and rails are protected along their length, and larger assemblies travel crated. Lead time is confirmed with the quotation: standard sizes normally ship within 5 to 15 days of a confirmed drawing, custom parts against the agreed schedule. Minimum order is one piece, and sample orders are accepted before a production run.
Send the model number or the drawing, with the shaft or rail size and the quantity you need, and we will reply with a quotation. For non-standard lengths, bore pairs, keyways and material changes we work from your drawing; bulk orders are quoted per quantity band and a sample can be supplied for approval.






Send your details and we will respond within 24 hours.